Riga and the surrounding area
Major Apartment Renovation
Major renovation in Riga and the surrounding area — a comprehensive process of renewing premises, utility systems and finishing works, with a clear sequence of works and a single accountable partner.
Get a quotation for major renovation
Major renovation with a clear sequence of works
Major renovation is suitable for situations where refreshing surfaces alone is not enough and several interconnected elements need to be renewed — finishing, electrical wiring, plumbing, flooring, partition walls or other components.
The scope of work is determined by the property’s actual condition and the desired outcome. Before starting, it is important to agree on the sequence, technical solutions and boundaries, so that the renovation is organised as a single project rather than a collection of separate jobs.
What's Included
Demolition and preparation
Removal of existing finishes, fixtures or structures, and preparation of the premises for further work.
Electrical wiring renewal
Assessment of the existing electrical wiring and rebuilding of the necessary cabling, sockets and connections within the agreed scope.
Plumbing works
Renewal of water supply, drainage and sanitary fittings, where required by the project.
Partition walls and surface levelling
Preparation or rebuilding of walls, ceilings and partitions in line with the planned layout.
Flooring and finishing
Floor base and covering, plus wall and ceiling finishing works, following technical preparation.
Final works
Finishing details, fittings and other final works included in the agreed project scope.
Suitable For
Apartments with outdated finishes
Properties requiring a complete renewal of premises and technical systems.
Apartments after purchase
Where the new owner wishes to redesign the layout and fully adapt the premises to their needs.
Private houses
For renovating the interior of houses, where several interconnected renovation stages need to be carried out.
Commercial premises areas
For individual areas of commercial premises requiring a technically structured rebuild and finishing.
Work Process
-
Enquiry
We gather information about the property and the planned scope of renovation.
-
Site visit
We assess the current condition, components and the technically required works.
-
Work plan
We arrange the sequence of demolition, utility system and finishing works.
-
Detailed quotation
We prepare a breakdown of works and cost items in line with the agreed scope.
-
Execution of works
We organise the renovation stages in the set sequence and monitor progress.
-
Handover
We check the agreed scope of work and hand over the completed property.
Price
from 300 €/m²
The exact price is prepared after a site visit and once the scope of work has been determined.
Get a Personalised QuoteWhat Affects the Price
- Important note about the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of work. Whether materials are included is clarified in the quotation.
- Current condition The extent of demolition and preparation work directly affects the total scope of work.
- Utility systems The need to rebuild electrical wiring and plumbing changes the complexity of the project.
- Layout changes Changes to partition walls, door openings or other components require additional technical work.
- Finishing standard The chosen materials and level of detail affect the scope of work and completion time.
- Site accessibility Access, floor level, logistics and working-hour restrictions can affect how the work is organised.
Timeframe
Major apartment renovation
An exact schedule is prepared after a site visit and agreement on the scope of work.
Renovation with utility system rebuilding
The timeline is significantly affected by the scope of technical work and the sequence in which it is carried out.
Renovation with layout changes
The schedule is set once the required solutions and the boundaries of the work have been clarified.
Documentation You Receive
-
Detailed quotation An agreed overview of work and cost items.
-
Scope of work The agreed works and boundaries are recorded for the project.
-
Handover documents The procedure for handing over completed works is adapted to the specific project.
-
Warranty conditions Where warranty conditions apply to the specific scope of work, they are recorded in the project documentation.
Frequently Asked Questions
How does major renovation differ from cosmetic repair?
Major renovation usually involves not only decorative surfaces but also technical components, utility systems, flooring, partition walls or other structural elements.
Can a major renovation be carried out in stages?
In some cases, the work can be divided into stages, but the sequence must be planned so that one stage does not interfere with the next.
Is a site visit necessary?
Yes, a site visit is essential for a detailed scope of work and quotation, as some technical conditions cannot be objectively assessed remotely.
Can some of the existing finishing be kept?
Yes, if the existing elements are technically suitable and can be safely integrated into the new design.
Where are major renovations carried out?
RigaBuild's main area of operation is Riga and the surrounding area; we confirm the specific location of the property when the request is submitted.