Riga and the surrounding area
New-Build Finishing
New-build finishing in Riga and the surrounding area — preparing rooms for living, from bare surfaces to fully finished walls, ceilings and floors.
Get a quotation for new-build finishing
New-build finishing from bare surfaces to a finished interior
New-build finishing works begin with an assessment of the existing surfaces and utility installations. This is followed by planning the preparation of walls and ceilings, tiling, painting, flooring, and other finishing tasks.
The scope of work is tailored to the specific configuration of the flat or house. RigaBuild coordinates the finishing stages in a single sequence, so the result is technically consistent and the rooms are ready for further furnishing.
What's Included
Base surface inspection
We assess the readiness of walls, ceilings and floors for the final finishing works.
Wall and ceiling preparation
We carry out the necessary levelling, filling and preparation for painting or other finishes.
Tiling and wet-area finishing
Tiling of bathrooms, kitchen areas and other designated surfaces within the agreed scope.
Flooring installation
Flooring and finishing details installed according to the chosen solution.
Painting and final finishing
Painting of walls and ceilings, skirting/trim and other completion works.
Suitable For
New-build flats
Properties handed over with unfinished or partially finished interior finishing.
New private houses
For the interior finishing stage after the main construction and utility works are complete.
Commercial premises in new developments
For fitting out premises for a specific use and completing the finishing works.
Work Process
-
Enquiry
We gather information about the property's condition and the desired finishing.
-
Site visit
We inspect the readiness of the base surfaces and technical connections.
-
Materials and work plan
We agree on the finishing sequence and the chosen solutions.
-
Quotation
We prepare the work and cost breakdown.
-
Finishing works
We carry out the preparation, tiling, painting and flooring works.
-
Handover
We check the quality and hand over the agreed scope of work.
Price
from 180 €/m²
The exact price is prepared after a site visit and once the scope of work has been determined.
Get a Personalised QuoteWhat Affects the Price
- Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of work. Whether materials are included is confirmed in the quotation.
- Initial condition of the property The readiness level of base surfaces can vary between different new developments.
- Area The total area of walls, ceilings, floors and wet areas affects the amount of work involved.
- Finishing materials The specifics of the chosen coverings and materials affect the work method.
- Detailing of connections Openings, niches, decorative solutions and other details increase the level of detail in the work.
Timeframe
Flat finishing
The schedule is determined by the area and the readiness of the base surfaces.
Interior finishing of a private house
The timeframe is determined by the volume of rooms, wet areas and the chosen finishing solutions.
Finishing with detailed elements
More complex materials and custom details may increase the completion time.
Documentation You Receive
-
Finishing works quotation An agreed overview of work and cost items.
-
Materials and scope of work We record the chosen solutions and the boundaries of the work.
-
Handover documents The procedure for handing over completed work is adapted to the specific property.
Frequently Asked Questions
What does new-build finishing mean?
It is a set of interior finishing works for a property where the main structures and utilities have already been installed, but the rooms are not yet fully ready for use.
Is it possible to carry out only part of the finishing?
Yes, it is possible to agree on a specific group of works, provided it can be technically separated from the rest of the process.
Do materials need to be chosen in advance?
Not necessarily, but the materials and technical solutions must be agreed before the relevant work stage begins.
Does the finishing include the bathroom and kitchen?
Yes, if tiling, surface preparation and other finishing works for these areas are included in the agreed scope.