Riga and the surrounding area

Private House Construction

Private house construction in Riga and the surrounding area — organising the works from preparation and foundations through to the building's structures, exterior works and interior finishing stages.

Get a quotation for private house construction
House construction work on site
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Private house construction with clear responsibility for the sequence of works

Private house construction consists of interconnected stages — preparation, foundations, load-bearing structures, the roof, the façade, utility installations and interior works. The quality of each stage affects the next, which is why coordinated organisation of the works is essential.

RigaBuild defines the scope of works based on the available project documentation and the specific needs of the site. Before construction begins, we clarify the boundaries, sequence, materials and responsibilities for technical solutions, so the project remains transparent from start to handover.

What's Included

Construction preparation

We assess the project information and site conditions, and agree on the scope boundaries of the works.

Foundation and structural stages

We organise construction of the agreed foundations, load-bearing structures and other structural elements of the building.

Roof and façade works

In line with the project scope, we coordinate works on the building's external enclosing structures.

Utility installation stages

The necessary technical systems works are planned in good time relative to the construction sequence.

Interior works and finishing

If included in the project, we organise interior preparation and finishing once the technical stages are complete.

Suitable For

New private houses

For construction of individual residential houses to an agreed project.

Houses with a split scope of works

Where RigaBuild takes on specific interconnected construction stages.

Sites with a completed project

For organising construction works where the necessary project and technical information is available.

Work Process

  1. Enquiry

    We gather information about the project, the site and the desired scope of works.

  2. Documentation review

    We review the available project information and technical solutions.

  3. Scope of works

    We agree on the construction stages, materials and responsibilities.

  4. Quotation and schedule

    We prepare the cost items for the agreed scope and the sequence of works.

  5. Construction works

    We organise the construction stages in line with the project and the technological sequence.

  6. Handover

    We check the agreed scope of works and organise the handover of the completed works.

Price

from 1,400 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of works. The inclusion of materials is clarified in the quotation.
  • Building size and structure The floor area, number of storeys and structural solution determine the scope of construction works.
  • Project readiness The level of detail in the available technical information affects the preparation process.
  • Materials and technologies The chosen structural and finishing systems affect the structure of the works and materials.
  • Site conditions Access, ground conditions, logistics and site organisation affect execution.
  • Scope of works package Building individual stages versus a fuller scope of works differ significantly in terms of resources.

Timeframe

Individual construction stages

The schedule is determined by the scope of the specific stage and readiness to begin works.

Full private house construction package

The timeframe is determined by the size of the building, the structural solutions and the sequence of works.

Construction with interior works

The schedule also incorporates technical systems and finishing stages, where these are included in the agreed scope.

Documentation You Receive

  • Works quotation An agreed overview of the construction works and cost items.
  • Scope of works and schedule We record the stages under RigaBuild's responsibility and their sequence.
  • Technical documentation Construction works are organised based on the project information required and available for the specific scope.
  • Handover documents The handover procedure for completed works is adapted to the specific scope of construction.
More About the Warranty

Frequently Asked Questions

Can RigaBuild carry out the full private house construction cycle?

The scope of works is determined for each specific project. It is possible to agree on several interconnected stages or a broader scope of construction works.

Is a completed house project required?

The amount of documentation needed to start construction works depends on the specific project and type of works; we first assess the information available.

Can I order just the foundations, roof or façade?

Yes, individual construction stages can be assessed as a separate scope of works, provided they can be clearly delineated.

How is the construction quotation determined?

The quotation is prepared after clarifying the project information, scope boundaries, materials and site conditions.

Where does RigaBuild build private houses?

Our main area of operation is Riga and the surrounding area; we assess specific sites based on the enquiry and project information.

Would you like a quote for your project?

Get a quotation for private house construction