Skip to content

Riga and the surrounding area

Interior Finishing

Interior finishing in Riga and the surrounding area — preparation and finishing of walls, ceilings, partitions, floors and final surfaces in a coordinated sequence of works.

Get a quotation for interior finishing
Interior finishing and wall preparation work
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Interior finishing from the base surface to the final details

Interior finishing begins with an assessment of how ready the surfaces and structures are. For a high-quality result, what matters is not only the paint or flooring, but also proper surface preparation, precise detailing, the correct sequence of works, and material compatibility.

RigaBuild organises the agreed scope of interior finishing works — from plasterboard, filling and tiling to painting, flooring and final details. The specific works are adapted to the condition of the property and the chosen finishing solution.

What's Included

Base surface assessment

We check the readiness of walls, ceilings and floors for the next finishing stages.

Plasterboard and partition works

Where included in the project, we build or adapt dry-lining structures.

Filling and surface preparation

We prepare surfaces for painting, wallpaper, tiles or other finishing materials.

Tiling and wet area finishing

We carry out the agreed tiling works and related finishing details.

Painting

Painting of walls and ceilings after appropriate surface preparation.

Flooring and final details

We install the agreed flooring, skirting boards and other finishing elements.

Suitable For

Apartments

For full or partial interior finishing following renovation, reconstruction or handover of a new build.

Private houses

For the final finishing of rooms once structural and utility works are complete.

New builds

For properties requiring finishing from the base surfaces through to fully finished rooms.

Commercial premises

For the interior finishing or refurbishment of offices, salons and other premises.

Work Process

  1. Enquiry

    We find out the floor area, the condition of the base surfaces and the desired result.

  2. Site visit

    We assess the surfaces, details and the preparation required.

  3. Finishing plan

    We agree the sequence of works, materials, and solutions for individual zones.

  4. Quotation

    We prepare the itemised works and costs.

  5. Finishing works

    We carry out the agreed dry-lining, surface, tiling, painting and flooring works.

  6. Handover

    We check the quality and hand over the agreed scope of works.

Price

from 80 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the price shown The price shown is an indicative starting price. The exact price is calculated following a site visit and determination of the scope of works. Whether materials are included is confirmed in the quotation.
  • Condition of the base surfaces The need for levelling, filling and repair affects the scope of preparation work.
  • Room area and layout The total surface area, openings, recesses and corners affect the amount of work.
  • Choice of materials Different coverings and finishing systems require different preparation and installation.
  • Extent of wet areas Waterproofing and tiling zones increase the scope of technical works.
  • Level of detail in finishing Skirting boards, trims, openings, joints and other finishing elements require additional precision.

Timeframe

Finishing of a single room

The schedule is determined by the condition of the surfaces and the finishing works chosen.

Full interior finishing of an apartment

The timeframe is determined by the number of rooms, wet areas, flooring and base surface preparation.

Interior finishing of a private house

The schedule is built up by room and work group, in line with the technological sequence.

Documentation You Receive

  • Finishing works quotation An agreed breakdown of works and cost items.
  • Scope of works and materials We record the finishing zones, material solutions and the boundaries of the works.
  • Handover procedure Completed works are inspected in accordance with the agreed scope.
More About the Warranty

Frequently Asked Questions

What work is included in interior finishing?

Depending on the property, this can include plasterboard, surface preparation, filling, painting, tiling, flooring and final details.

Can I order just one type of finishing work?

Yes, individual finishing works can be assessed as a separate scope where they can be technically correctly separated.

Does RigaBuild help with agreeing the choice of materials?

During work planning, we clarify the technical requirements for materials and their compatibility with the intended finishing solution; the specific supply package is agreed as part of the project.

Do the utility installations need to be finished before interior finishing?

The sequence of works must be planned so that the necessary concealed technical works are completed before the final finishing.

Where are interior finishing works carried out?

RigaBuild's main operating region is Riga and the surrounding area; we assess specific properties upon enquiry.

Would you like a quote for your project?

Get a quotation for interior finishing