Skip to content

Riga and the surrounding area

Tiling Works

Tiling works in Riga and the surrounding area — base preparation, tile layout planning, installation and finishing of junctions in bathrooms, kitchens and other rooms.

Get a quotation for tiling works
Tiling work during a room renovation
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Tiling begins with a properly prepared base

Quality tiling depends on a stable, level base with proper preparation. In wet areas, the necessary technical works and planned waterproofing must be completed before tiles are laid.

RigaBuild plans the tile layout, cuts and visible junctions according to the specific room and material. The scope of works may include base preparation, tiling, grouting, and finishing profiles or other agreed elements.

What's Included

Base inspection

We assess the surface's levelness, stability and readiness for tiling.

Base preparation

We carry out the agreed levelling, priming and other necessary preparation works.

Layout planning

We agree the tile starting lines, joint logic and placement of visible cuts.

Tile installation

We lay tiles on the prepared base according to the chosen material and solution.

Grouting and finishing junctions

We fill the joints and finish the agreed profiles, corners and transitions.

Suitable For

Bathrooms

For tiling walls, floors and shower areas after technical works and base preparation.

Kitchens

For tiling worktop areas, floors or other agreed kitchen surfaces.

Hallways and corridors

For installing durable tiled floors in living spaces.

Commercial premises areas

For tiled floors and walls where the material suits the specific use of the premises.

Work Process

  1. Enquiry

    We find out the area, room and the type of tiles chosen.

  2. Site visit

    We assess the base, junctions and the readiness of preceding works.

  3. Layout

    We agree the tile direction, joints and visible cuts.

  4. Quotation

    We prepare the works and cost items.

  5. Tiling works

    We carry out base preparation, tile installation and joint finishing.

  6. Handover

    We check the agreed surface and the execution of junctions.

Price

from 35 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of works. Inclusion of materials is confirmed in the quotation.
  • Condition of the base Uneven or damaged surfaces increase the scope of preparation works.
  • Tile format Large-format tiles, mosaics and other specific tiles require a different installation technique.
  • Layout and cuts Diagonals, niches, corners and complex patterns increase the amount of cutting and measuring required.
  • Number of junctions External corners, profiles, drains, openings and other elements increase the level of detail.
  • Wet areas The necessary base and waterproofing preparation affects the overall sequence of works.

Timeframe

Small tiling area

The schedule is determined by the readiness of the base and the tile layout.

Bathroom tiling

The timeframe is determined by the wall and floor area, junctions, tile format and amount of grouting.

Large-format or complex layout

Additional measurements, cuts and installation requirements may increase the completion time.

Documentation You Receive

  • Works quotation An agreed overview of tiling works and cost items.
  • Scope of tiled areas We record the walls, floors and other junctions included in the project.
  • Material and layout agreement If necessary, we record the tile format and the main layout principle.
More About the Warranty

Frequently Asked Questions

Does the tiling price include base preparation?

The need for base preparation is assessed separately and included in the agreed scope of works if required.

Does RigaBuild install large-format tiles?

We assess the feasibility of installing a specific material based on the tile size, base, room and required junctions.

Is waterproofing needed in the bathroom before tiling?

In wet areas, the base and waterproofing solution must be prepared in line with the planned construction before tiles are laid.

Is it possible to tile just the kitchen worktop area?

Yes, a small separate area can be assessed as a standalone job, provided the base is properly prepared.

What has the greatest impact on the scope of tiling works?

The area, condition of the base, tile format, layout, and the number of cuts and junctions.

Would you like a quote for your project?

Get a quotation for tiling works