Skip to content

Finishing Works

Services in this category

Laminate flooring installation work
Finishing Works

Flooring Installation

Floor base preparation and covering installation, including transitions, skirting boards and other finishing details.

Interior finishing and wall preparation work
Finishing Works

Interior Finishing

A complete sequence of interior finishing works — surface preparation, plasterboard, tiling, painting, flooring and final details.

A new-build flat during interior fit-out
Finishing Works

New-Build Finishing

Interior finishing of new-build flats and houses, from preparing bare surfaces to the final finishing works on walls, ceilings and floors.

Wall painting work during a room renovation
Finishing Works

Painting Works

Wall and ceiling preparation and painting, with the scope of work adapted to the condition of the surface and the chosen finishing system.

Plasterboard preparation and installation work
Finishing Works

Plasterboard Installation

Installation of plasterboard partition walls, ceilings, niches and technical casings, with the structure prepared for subsequent finishing.

Tiling work during a room renovation
Finishing Works

Tiling Works

Wall and floor tiling with base preparation, layout planning and finishing of junctions.