Riga and the surrounding area
Full-Cycle Construction
Full-cycle construction in Riga and the surrounding area — coordination of interrelated construction works, from preparation and structures through to the building's exterior and interior finishing stages.
Get a quotation for full-cycle construction
Full-cycle construction with a single coordinated work plan
In full-cycle construction, what matters is not only the quality of individual works but also the correct sequence of stages and division of responsibilities. A project may cover site preparation, foundations, structures, the roof, the façade, utility systems and interior works.
RigaBuild defines the scope of works based on the specific project documentation and agrees on the stages the company will coordinate and carry out. This makes it possible to maintain a clear overview of construction progress, cost items and upcoming works.
What's Included
Site and works preparation
We assess the project information, access and logistics, and agree the boundaries of the works.
Foundations and load-bearing structures
We organise the agreed foundation and structural stages of the building.
Roof and building envelope
We coordinate the works on the roof, façade and other external building elements in accordance with the project.
Utility systems
The stages for technical systems are planned in good time relative to the structural and finishing works.
Interior works and finishing
If included in the agreed scope, we also organise room preparation and final finishing.
Suitable For
New private houses
For the construction of individual residential buildings involving several interrelated stages.
Larger renovation projects
Where a project requires the coordinated execution of several groups of construction works.
Properties with a completed technical project
When sufficient project information is available for planning the works and preparing the quotation.
Work Process
-
Enquiry
We gather the project information and the desired scope of construction works.
-
Documentation review
We assess the available drawings and technical solutions.
-
Works and responsibility plan
We agree the stages, materials and boundaries that fall under RigaBuild's responsibility.
-
Quotation and schedule
We prepare the sequence of works and the cost items.
-
Construction execution
We coordinate the interrelated construction stages.
-
Handover
We inspect the completed works and organise the handover of the agreed scope.
Price
from 1,800 €/m²
The exact price is prepared after a site visit and once the scope of work has been determined.
Get a Personalised QuoteWhat Affects the Price
- Important information about the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of works. Whether materials are included is clarified in the quotation.
- Project scope The building's floor area, number of storeys and scope of works determine the overall volume of construction work.
- Structural solutions The chosen structural systems and the complexity of the connection details affect the resources required.
- Scope of utility systems The extent of the technical systems affects both the sequence of works and the cost structure.
- Level of finishing If the full cycle includes interior finishing, the chosen materials and level of detail affect the overall scope.
- Site logistics Access, material deliveries and site organisation affect the work plan.
Timeframe
Structural stage
The schedule is determined based on the building's scope and structural solutions.
Construction to a closed shell
The timeframe is determined by the sequence of foundations, structures, roof and external elements.
Fuller construction cycle
If utility systems and finishing are included, the schedule is drawn up for all interrelated stages.
Documentation You Receive
-
Detailed quotation An agreed overview of works and cost items.
-
Scope of works and responsibilities We record the construction stages that fall under RigaBuild's responsibility.
-
Work schedule We organise the sequence of the main stages and their interdependencies.
-
Handover documents The procedure for handing over completed works is adapted to the specific construction project.
Frequently Asked Questions
What does full-cycle construction mean?
It means the coordinated execution of several interrelated construction stages within a single project, rather than just one individual task.
Does the full cycle always include interior finishing?
No, the scope of works is agreed for the specific project; it is also possible to agree on a particular part of the cycle.
Is it possible to take over a project where some works have already been completed?
Yes, provided the existing condition and available documentation can be assessed and the scope of the remaining works can be clearly defined.
How is the sequence of works controlled?
Before execution, a work plan is drawn up in which the interrelated stages are arranged in a technologically logical sequence.
Is the quotation prepared before construction works begin?
The quotation is prepared once the project information, scope of works and division of responsibilities have been clarified.