Skip to content

Riga and the surrounding area

Apartment Renovation

Apartment renovation in Riga and the surrounding area — from site visit and work plan to finishing and handover.

Get a quotation for apartment renovation
Apartment renovation work in progress
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Apartment renovation with a single dedicated partner

The scope of an apartment renovation always depends on the existing condition, the desired outcome and the required utilities. Before work begins, it’s important to establish priorities, sequence and boundaries, bringing preparation, technical work and finishing together into a single plan.

RigaBuild’s service structure is designed for both full apartment renovations and the refurbishment of individual areas. The specific scope of work, materials, timeframe and cost are confirmed after a site visit and once the required scope of work has been determined.

What's Included

Site visit and work plan

Assessment of the existing condition, setting priorities and preparing the work sequence for the specific apartment.

Demolition and preparation works

Removal of old finishing materials, structures or elements as required, and surface preparation for the following works.

Electrical works

The scope of electrical work is determined after assessing the existing system and the planned solution.

Plumbing works

Water supply and drainage works are included where required for the specific renovation project.

Wall and ceiling finishing

Surface preparation and finishing in line with the chosen solution and materials.

Flooring and final finishing

Installation of flooring and other final finishing elements according to the agreed scope of work.

Suitable For

New-build apartments

For full or partial finishing and planned adaptation of rooms.

Standard-series apartments

For renewing existing finishes, utilities and room functionality.

Pre-war building apartments

For renovations where it is especially important to assess the condition of the existing structures and utilities before work begins.

Apartments for partial refurbishment

For renovating individual rooms or areas when a full renovation is not required.

Work Process

  1. Enquiry

    You describe the property, the planned scope of work and your main priorities.

  2. Consultation

    We clarify your needs and agree on the next step.

  3. Site visit

    We assess the existing condition and confirm the technically required works.

  4. Detailed quotation

    The scope of work and cost items are structured after the site visit and the agreed solution.

  5. Contract and works

    Once the terms are agreed, the works are organised and carried out in the set sequence.

  6. Handover

    The completed works are inspected and handed over in line with the agreed scope of work.

Price

from 280 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note about the price shown The price shown is an indicative starting price. The exact price is calculated after a site visit and once the scope of work has been determined. Whether materials are included is confirmed in the quotation.
  • Apartment area The total area and the number of rooms being renovated affect the volume of work and materials.
  • Existing condition The extent of demolition, levelling and preparation work depends on the actual condition of the property.
  • Scope of work Cosmetic refurbishment and a full rebuild require a different sequence of work and different resources.
  • Utilities Rebuilding electrical, water supply, drainage and other systems changes the overall scope.
  • Materials and solutions The chosen finishing materials and technical solutions affect both the cost and the organisation of the work.
  • Technical complexity Non-standard junctions, structural changes and difficult access can increase the scope of work.

Timeframe

Cosmetic refurbishment

The exact timeframe is determined after the list of works and the site visit.

Major renovation

The timeframe depends on the extent of demolition, utilities and finishing works.

Full apartment renovation

The work schedule is prepared once the technical scope and chosen solutions have been agreed.

Documentation You Receive

  • Detailed quotation An agreed overview of work and cost items for the specific project.
  • Contract The scope of work, the parties' responsibilities and the agreed terms are set out in the contract.
  • Handover documents The handover procedure and documents for completed works are adapted to the scope of the specific project.
  • Warranty terms Where warranty terms apply to the specific scope of work, they are set out in the project documentation.
More About the Warranty

Frequently Asked Questions

How much does an apartment renovation cost?

The exact cost depends on the apartment's area, existing condition, scope of work, utilities and the materials chosen. That's why the final quotation is prepared after a site visit and once the scope of work has been confirmed.

How long does an apartment renovation take?

The timeframe depends on the type of renovation and its technical scope. After a site visit, a more specific work sequence and schedule can be prepared.

Can only part of the renovation be carried out?

Yes, the scope of work can also be planned for individual rooms or groups of works, provided it is technically justified and matches the project's goal.

Is a site visit required before the quotation?

For a detailed quotation, a site visit helps to accurately determine the existing condition, scope of work and technical conditions, which are not always possible to assess remotely.

Where does RigaBuild carry out work?

Our main area of operation is Riga and the surrounding area. The specific location of the property can be confirmed at the time of enquiry.

Would you like a quote for your project?

Get a quotation for apartment renovation