Skip to content

Riga and the surrounding area

Flooring Installation

Flooring installation in Riga and the surrounding area — base assessment and preparation, covering installation, and finishing detail work in residential and commercial premises.

Get a quotation for flooring work
Laminate flooring installation work
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

A quality floor covering starts with the right base

The durability and visual quality of a floor covering depend not only on the material itself, but also on the levelness, moisture content and stability of the base, and on preparation appropriate to the chosen system. Different coverings require different installation technologies and detailing.

NordBuild assesses the base and organises the agreed scope of flooring work — removal of the old covering, levelling, installation of the new covering, transitions and skirting boards. The specific solution is adapted to the room’s use and the chosen material.

What's Included

Base assessment

We check the levelness, stability and other factors that affect installation of the chosen covering.

Removal of the existing covering

If included in the scope of work, we remove the old covering and prepare the base for further work.

Base preparation

We carry out the agreed local repairs, levelling or other necessary preparation.

Floor covering installation

We install the agreed covering in line with the material's technology and the room's design.

Transitions and skirting boards

We complete the agreed connections between coverings, skirting boards and other finishing details.

Suitable For

Apartments

For replacing floor coverings during renovation or installing new finishing.

Private houses

For floor base and finishing covering work in living spaces.

New builds

For the final flooring finish stage once the base is ready.

Commercial premises

For installing floor coverings suited to the premises' use, within the agreed scope.

Real Projects

No related projects have been published for this service yet.

Work Process

  1. Enquiry

    We find out the room area, the existing floor and the planned covering.

  2. Site visit

    We assess the condition of the base, its levelness and the preparation required.

  3. Covering solution

    We agree on the installation approach, transitions and finishing details.

  4. Quotation

    We prepare the work and cost breakdown.

  5. Flooring work

    We carry out the agreed removal, base preparation and covering installation.

  6. Handover

    We inspect the completed covering and finishing details.

Price

from 15 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note about the stated price The stated price is an approximate starting price. The exact price is calculated after a site visit and determination of the scope of work. The inclusion of materials is confirmed in the quotation.
  • Condition of the base Unevenness, damage and the preparation required affect the overall scope of work.
  • Floor area and room shape The total area, alcoves and number of rooms affect the scope of installation.
  • Type of covering Different materials have different base and installation requirements.
  • Installation pattern A diagonal, herringbone or other detailed pattern can increase the amount of measuring and cutting required.
  • Transitions and skirting boards Doorways, junctions between different coverings and skirting boards increase the amount of finishing work.

Timeframe

Replacing the floor in one room

The schedule is determined by the readiness of the base and the chosen covering.

Flooring work for an entire apartment

The timeframe is determined by the number of rooms, the type of covering and the extent of base preparation.

Complex installation pattern

Additional measuring, cutting and detailed joints can increase the completion time.

Documentation You Receive

  • Work quotation An agreed overview of flooring work and cost items.
  • Scope of flooring areas We record the rooms, coverings and base works included in the project.
  • Covering and detailing solution If required, we agree on the main installation approach, transitions and skirting boards.
More About the Warranty

Frequently Asked Questions

Does the floor always need to be levelled before installing a new covering?

Not always. This depends on the levelness and stability of the base, and the requirements of the chosen covering.

Does NordBuild remove the old floor covering?

Yes, removal of the existing covering and preparation of the base can be included in the agreed scope of work.

Is it possible to install flooring in a herringbone pattern?

We assess the specific installation pattern and material based on the room, the base and the covering system; a more detailed pattern affects the scope of work.

Are skirting boards included in the flooring work?

Installation of skirting boards and transitions can be included in the overall scope if agreed before the quotation.

What has the biggest impact on the price of flooring work?

The condition of the base, the floor area, the type of covering, the installation pattern and the number of finishing details.

Would you like a quote for your project?

Get a quotation for flooring work