Skip to content

Riga and the surrounding area

Whole-House Renovation

House renovation in Riga and the surrounding area — technical and functional refurbishment of an existing private house, with construction, utilities and finishing works planned in a logical sequence.

Request a quotation for house renovation
A house undergoing extensive renovation
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

House renovation with a view to the whole building

Renovation is the right choice when it is not just the interior finishing that needs updating, but also several elements of the building — utilities, thermal performance, the façade, roof details or the internal layout. In these projects, it is important to look at the building as a whole, so that individual solutions work together.

RigaBuild helps structure the scope of renovation works, set priorities and organise execution in logical stages. Specific technical solutions are chosen following a site inspection and a review of the available project information.

What's Included

Building condition assessment

We inspect the building's key elements and draw on the available project and technical information to compile our assessment.

Renovation work plan

We organise priorities and interrelated works into a logical sequence of execution.

Utilities renovation

Where necessary, we include electrical wiring, water supply and other technical systems within the scope of the renovation.

Structural and component renovation

Depending on the project's needs, works on the roof, façade, partition walls or other building elements are planned.

Insulation and exterior finishing

If included in the project, we integrate improvements to the building's envelope and exterior finishing into the renovation.

Interior finishing

After the technical works, we organise room preparation and final finishing.

Suitable For

Older private houses

For buildings where several systems and structural elements need to be renovated at the same time.

Houses before moving in

For properties where the new owner wants to adapt the technical condition and layout to their needs.

Houses with energy-efficiency upgrades

If the renovation includes insulation, façade, roof or other building-envelope works.

Partially renovated houses

For properties where some works have already been carried out, but the remaining stages need to be organised into a unified plan.

Work Process

  1. Enquiry

    We gather information about the building and the goals of the renovation.

  2. Site inspection

    We assess the building's condition and the available technical information.

  3. Priorities and solutions

    We agree on the sequence of works and the technical solutions required.

  4. Quotation and schedule

    We prepare the scope of works, cost items and the order of execution.

  5. Renovation works

    We organise the interrelated construction and finishing stages.

  6. Handover

    We check the agreed scope and hand over the completed works.

Price

from 450 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the price shown The price shown is an indicative starting price. The exact price is calculated after a site inspection and once the scope of works has been determined. Whether materials are included is specified in the quotation.
  • Technical condition of the building The condition of the existing structures and systems determines the scope of preparation and renovation.
  • Depth of renovation Improving individual zones and carrying out a comprehensive renovation differ significantly in scope of work.
  • Utilities Replacing or rebuilding systems increases the technical complexity of the project.
  • Façade, roof and insulation Works on external structures affect the overall scope of materials and organisation.
  • Need for design and approvals If the specific changes require additional technical documentation or approvals, this affects the project's preparation.

Timeframe

Partial house renovation

The schedule is determined based on the selected building zones and the scope of technical works.

Comprehensive renovation

The timeframe is determined by the interrelated sequence of multiple construction, utilities and finishing stages.

Renovation with external works

The schedule must take into account the technological sequence and conditions of façade, roof or other external works.

Documentation You Receive

  • Works and cost quotation An agreed overview of the renovation works and cost items.
  • Work plan We record the main stages and the boundaries of the works.
  • Technical information In the project, we use the available and necessary technical solutions in line with the agreed scope.
  • Handover documents The handover procedure for completed works is adapted to the renovation project.
More About the Warranty

Frequently Asked Questions

How does house renovation differ from a standard repair?

Renovation usually covers a larger part of the building and can include not only interior finishing but also utilities, the façade, roof details, insulation or changes to the layout.

Can renovation be carried out in stages?

Yes, but the stages must be planned in a coordinated sequence so that work already completed is not damaged by subsequent works.

Is technical documentation required before renovation?

This depends on the specific scope of works and changes involved. We assess this based on the property and the planned solutions.

Can the façade and insulation be included in the renovation?

Yes, if this fits the goals of the specific project and the agreed technical scope.

Is it possible to renovate a house while still partially using it?

In certain projects this is possible, if the works can be safely divided into zones and organised in stages.

Would you like a quote for your project?

Request a quotation for house renovation