Bathroom Renovation

Bathroom renovation in Riga and the surrounding area — demolition, plumbing, waterproofing, tiling and final finishing works in one coordinated sequence.

Get a quotation for bathroom renovation
Bathroom tiling and renovation work
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Bathroom Renovation Following the Correct Technical Sequence

In a bathroom, several groups of work are closely interconnected: demolition, water and drainage connections, electrical wiring, substrate preparation, waterproofing, tiling and the installation of sanitary fittings. Mistakes made in the early stages are difficult and costly to correct later on.

RigaBuild organises bathroom renovation work in sequence — first clarifying the layout and technical points, then preparing the substrates, and only after that moving on to the final finishing work. The specific scope of work and materials is agreed individually for each property.

What's Included

Demolition

We remove the agreed old surfaces, sanitary fittings and other elements, preparing the room for technical works.

Plumbing and drainage works

We adapt or renew connections in line with the agreed layout.

Electrical wiring preparation

Where necessary, we adapt the connection points for lighting, sockets and appliances.

Substrate and waterproofing

We prepare the walls and floor and install the agreed waterproofing solution for the wet zone.

Tiling

We carry out wall and floor tiling, following the chosen layout and detailing.

Sanitary fittings and finishing works

We install the agreed fittings and complete the visible finishing details.

Suitable For

Apartment bathrooms

For full or partial bathroom renovation.

Private house bathrooms

For the reconstruction and finishing of new or existing sanitary rooms.

Individual shower or WC areas

For the renovation of specific wet zones, where the scope of work can be technically separated.

Work Process

  1. Enquiry

    We find out the size of the room, its current condition and the desired layout.

  2. Site visit

    We assess the connections, substrates and technical constraints.

  3. Detail and materials plan

    We agree on the sanitary fitting points, tiles and the main finishing solutions.

  4. Quotation

    We prepare the cost items for the agreed scope of work.

  5. Renovation works

    We carry out demolition, technical works, waterproofing, tiling and installation in sequence.

  6. Handover

    We check the agreed scope of work and the final details.

Price

from 3,000 € per project

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of work. The inclusion of materials is clarified in the quotation.
  • Condition of the room The condition of the old surfaces and substrates determines the scope of demolition and preparation.
  • Changes to plumbing points Relocating connections or installing new points increases the scope of technical work.
  • Tile size and layout The format, number of cuts and complex details affect the tiling work.
  • Sanitary fitting solutions Built-in systems, shower zones and other details affect preparation and installation.
  • Room geometry Niches, recesses, slopes and other elements increase the level of finishing detail.

Timeframe

Partial bathroom renovation

The schedule is determined by the specific scope of work and the elements being retained.

Full bathroom renovation

The timeframe is determined by the sequence of demolition, technical works, substrates and tiling.

Bathroom with layout changes

Additional plumbing and structural changes are included in the overall schedule.

Documentation You Receive

  • Detailed quotation An agreed overview of bathroom renovation work and cost items.
  • Scope of work and details We record the sanitary fitting points, finishing zones and agreed works.
  • Material solutions Where necessary, we record the chosen tiles, sanitary fittings and other technically significant elements.
  • Handover procedure The completed work is checked against the agreed scope.
More About the Warranty

Frequently Asked Questions

Does bathroom renovation include plumbing works?

Yes, the necessary adaptation of water supply and drainage connections can be included in the overall scope of the renovation.

Is it possible to relocate the shower, washbasin or toilet?

This depends on the existing connections and technical possibilities; we clarify the solution after a site visit.

Is waterproofing a separate stage of work?

Preparing the substrate of the wet zones and applying appropriate waterproofing is an essential part of the work sequence for a tiled bathroom.

Can I order tiling only for the bathroom?

Yes, if the substrates and previous technical works have been prepared in line with the tiling requirements.

Is a site visit needed before the quotation?

For a full bathroom renovation, a site visit helps accurately assess the connections, substrates and the required scope of demolition.