Skip to content

Riga and the surrounding area

Building Insulation

Building insulation in Riga and the surrounding area — organising the insulation of external structures and related façade finishing works according to the specific solution for each property.

Get a quotation for building insulation
Building insulation work with thermal insulation material
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Building insulation as part of a well-planned renovation

In insulation works, it is not only the installation of thermal insulation that matters, but also the condition of the substrate, the junctions with windows, the plinth, the roof, and other details that affect the performance of the whole system.

RigaBuild organises the agreed scope of insulation and related façade works according to the specific project and the condition of the building. Solutions are selected based on the available technical information and the intended finishing system.

What's Included

Substrate assessment

We assess the condition of the external surfaces, any damage, and readiness for the insulation system.

Substrate preparation

We carry out the agreed repair and preparation works before installing the thermal insulation.

Thermal insulation system

We install the insulation system specified in the project, within the agreed scope.

Connection details

We treat window, plinth, roof, and other junctions included in the agreed solution.

Final façade finishing

We carry out the protective layers and external finishing works specified for the insulation system.

Suitable For

Private houses

For insulating existing buildings and renewing their façades.

Buildings under renovation

When insulation is one stage of a broader renovation project.

New builds

For installing the insulation of external structures and the façade system according to the project.

Work Process

  1. Enquiry

    We gather information about the building, the area, and the planned solution.

  2. Site visit / documentation

    We assess the substrate, junctions, and available technical information.

  3. System scope

    We agree on the insulation, fixing, and finishing solution.

  4. Quotation

    We prepare the work and cost items.

  5. Insulation works

    We carry out preparation, installation of the system, and final finishing.

  6. Handover

    We inspect the agreed scope of work and the key junctions.

Price

from 55 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note about the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of work. The inclusion of materials is specified in the quotation.
  • Area to be insulated The extent of the façade and other external structures determines the amount of materials and work.
  • Condition of the substrate Repairing damage and levelling can increase the scope of preparation work.
  • Insulation system The chosen material, thickness, and fixing solution affect the technology used.
  • Detailing of junctions Window openings, the plinth, roof connections, and other junctions increase the level of precision required.
  • Building height and access Scaffolding, lifts, and logistics affect the organisation of the works.

Timeframe

Insulating a section of the façade

The schedule is determined by the area, the substrate, and access.

Full insulation of a private house

The timeline is determined by the extent of the façade, the number of junctions, and the finishing system.

Insulation within a renovation project

The schedule is coordinated with other façade and external construction works.

Documentation You Receive

  • Quotation for the works An agreed overview of the insulation and finishing works.
  • System and scope of works We record the areas to be insulated, the junctions, and the agreed solution.
  • Handover procedure Completed works are inspected in accordance with the agreed scope.
More About the Warranty

Frequently Asked Questions

Can insulation be carried out without façade finishing?

The specific insulation solution usually also includes the protective and finishing layers required for the system; the exact scope is determined by the project and the chosen system.

Does the façade need to be repaired before insulation?

If the substrate is damaged, this must be assessed and addressed to the required extent before the insulation system is installed.

What affects the price of building insulation?

The area, the condition of the substrate, the system solution, the number of junctions, the height of the building, and access.

Can insulation be combined with other renovation works?

Yes, insulation is often planned together with façade, roof, or other external works on the building.

Would you like a quote for your project?

Get a quotation for building insulation