Skip to content

Riga and the surrounding area

Facade Works

Facade works in Riga and the surrounding area — preparation, repair and finishing of exterior surfaces, coordinating junctions, materials and connections with windows, the plinth and the roof zone.

Get a quotation for facade works
Facade renovation work on scaffolding
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Facade restoration with attention to the substrate and junctions

In facade works, the final result depends not only on the finishing material but also on the condition of the substrate, cracks, moisture effects and junctions with windows, the plinth, the roof and other elements of the building. That is why, before work begins, the existing surface must be assessed and the necessary preparation determined.

RigaBuild coordinates the agreed scope of facade works, from preparation and local repairs through to the final finishing or insulation-related stages, if these are included in the project.

What's Included

Facade condition assessment

We assess the visible condition of the substrate, damage and junction details.

Surface preparation

We carry out the agreed cleaning, repair of damaged areas and substrate preparation for finishing.

Crack and local damage repair

In line with the chosen system, we treat the agreed damage and problem areas.

Facade finishing

We apply or restore the chosen exterior finishing system within the agreed scope.

Junction details

We resolve the agreed junctions at windows, the plinth, the roof and other facade elements.

Suitable For

Private houses

For facade restoration, repair or final exterior finishing.

Buildings under renovation

For properties where facade works form part of wider renovation.

New builds

For the exterior finishing stage once the structure and substrate are ready.

Work Process

  1. Enquiry

    We gather information about the building, facade area and desired result.

  2. Site visit

    We assess the substrate, damage, access and junction details.

  3. Solution agreement

    We determine the scope of preparation and the finishing system.

  4. Quotation

    We prepare the works and cost line items.

  5. Facade works

    We carry out preparation, repair and final finishing.

  6. Handover

    We check the agreed scope and completion of junction details.

Price

from 30 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of works. Inclusion of materials is confirmed in the quotation.
  • Facade area The total area of surface to be treated determines the amount of work and materials.
  • Substrate condition Cracks, delamination and other damage increase the scope of preparation.
  • Finishing system The chosen material and layer system affects the technology and number of works.
  • Building height and access Scaffolding, lifts and access options affect how the work is organised.
  • Number of junctions Windows, plinth, corners, roof connections and other elements increase the level of detail.

Timeframe

Local facade repair

The schedule is determined by the extent of damage and access.

Full facade restoration

The timeframe is determined by the area, substrate preparation and the chosen finishing system.

Facade within a renovation project

The schedule is coordinated with other exterior works on the building.

Documentation You Receive

  • Works quotation An agreed overview of facade works and cost line items.
  • Scope of finishing We record the surfaces, junctions and works included in the project.
  • Handover procedure Completed works are checked against the agreed scope.
More About the Warranty

Frequently Asked Questions

Is a site visit required before facade repair?

Yes, a site visit helps assess the condition of the substrate, cracks, junction details and access to the building.

Can facade works be combined with insulation?

Yes, if insulation is included in the technical scope of the specific project.

Is it possible to repair only the damaged facade areas?

In some cases, yes, if local repair is technically justified and compatible with the existing finish.

What affects the price of facade works?

Area, substrate condition, the chosen finishing system, building height, access and the complexity of junctions.

Would you like a quote for your project?

Get a quotation for facade works