Riga and the surrounding area
Roofing Works
Roofing works in Riga and the surrounding area — renovation of an existing roof or stages of new roof construction, including base, covering and related junction works.
Get a quotation for roofing works
Roofing works with careful attention to junctions and sequence
In roofing works, both the covering and the base matter, along with connection and edge junctions, drainage, and compatibility with the rest of the building’s elements. Before work begins, the existing condition must be assessed, or the solution must follow the new-build project design.
RigaBuild organises the agreed scope of roofing works from preparation through to the finishing details, adapting the work sequence to the specific structure and the chosen roofing system.
What's Included
Assessment of roof condition or project
For an existing roof, we assess the visible condition; for a new build, we follow the project design.
Base and structural works
Within the agreed scope, we carry out the necessary preparation of the base or roof structure.
Installation of roof covering
We install or renovate the covering according to the chosen roofing system.
Connections and sheet metal details
We finish edges, connections, outlets and other roof details within the agreed scope.
Drainage elements
If included in the project, we install or renovate gutter systems and related elements.
Suitable For
Private houses
For renovating existing roofs or building new ones.
Extensions and reconstructions
Where the new roof section needs to be connected to the existing building.
Other small building roofs
Where a clear technical solution and defined scope of work are available.
Work Process
-
Enquiry
We gather information about the roof, its area, and the issue or project.
-
Site visit / documentation
We assess the existing roof or the project design.
-
Scope of works
We agree on the base, covering, details and gutter system.
-
Quotation
We prepare the work and cost items.
-
Roofing works
We carry out the agreed stages of roof construction or renovation.
-
Handover
We check the agreed scope and the finishing details.
Price
from 45 €/m²
The exact price is prepared after a site visit and once the scope of work has been determined.
Get a Personalised QuoteWhat Affects the Price
- Important note on the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of works. Whether materials are included is specified in the quotation.
- Roof area and shape Slopes, planes and complex joints affect the scope of work.
- Existing structure Damage or the need for rebuilding can increase the scope of preparation.
- Covering type Different roofing systems have different installation techniques and details.
- Connections and outlets Chimneys, windows, ventilation outlets and other details increase the level of complexity.
- Roof access The building's height and access affect work organisation and safety measures.
Timeframe
Localised roof repair
The schedule is determined by the extent of damage and access.
Covering replacement
The timeline is determined by the roof area, condition of the base and the covering system.
New roof construction
The schedule is set according to the project's structure, details and sequence of works.
Documentation You Receive
-
Works quotation An agreed overview of roofing works and cost items.
-
Scope of works We record the roof planes, details and elements included in the project.
-
Handover procedure Completed works are checked in accordance with the agreed scope.
Frequently Asked Questions
Does RigaBuild carry out both roof repairs and new roof construction?
Yes, the specific scope of work is assessed based on the existing condition or the project design.
Is a site visit required before roof repair?
Yes, a site visit helps assess the covering, base and visible details, whose condition cannot be determined remotely.
Is it possible to replace only the roof covering?
This is possible if the existing base and structure are technically suitable for the new solution.
What has the greatest impact on the cost of roofing works?
Area, roof shape, the condition of the existing structure, covering type, number of details and access.