Skip to content

Riga and the surrounding area

Cosmetic Renovation

Cosmetic renovation in Riga and the surrounding area — refreshing spaces with surface preparation, painting, and renewal of flooring and other finishing elements.

Get a quotation for cosmetic renovation
Walls being painted during a cosmetic refurbishment
  • Contract
  • Warranty
  • Detailed quotation
  • Responsible project manager

Cosmetic renovation without unnecessary rebuilding

Cosmetic renovation is suitable when the layout and main technical systems can be retained, but the finishes and visual quality need to be renewed. The scope of work may include preparing walls and ceilings, painting, replacing floor coverings, and other finishing works.

Before starting, we assess the condition of the surfaces and agree on which elements to keep and where additional preparation is needed. This helps avoid unnecessary work and keep the renovation scope clearly defined.

What's Included

Surface preparation

Preparing uneven areas, cracks and localised damage before the final finish.

Wall and ceiling painting

Painting works carried out after surface preparation and agreement on the chosen finishing system.

Floor covering renewal

Replacing existing coverings or installing a new one, if included in the scope of the renovation.

Trims and finishing elements

Skirting boards, small finishing details and other finishing elements within the agreed scope.

Localised finishing repairs

Renewal of individual walls, ceilings or other finished areas without a full rebuild.

Handover of works

Inspection and handover of the completed finishing works according to the agreed scope.

Suitable For

Flats in good technical condition

Where the main utilities and layout do not need to change, but a visual refresh is required.

Rental flats

For refreshing the space between tenancies or before re-letting.

Individual rooms in a house

For renewing the finishes of rooms, hallways or other areas.

Commercial premises areas

For visually refreshing offices or other premises when a full rebuild is not required.

Work Process

  1. Enquiry

    We find out the scope of the space and the desired outcome.

  2. Site visit

    We assess the condition of the surfaces and the preparation required.

  3. Finishing solution

    We agree on the works, materials and the elements to be retained.

  4. Quotation

    We prepare the work and cost items.

  5. Finishing works

    We carry out the preparation and final finishing.

  6. Handover

    We check the quality and hand over the completed scope.

Price

from 90 €/m²

The exact price is prepared after a site visit and once the scope of work has been determined.

Get a Personalised Quote

What Affects the Price

  • Important note about the stated price The stated price is an indicative starting price. The exact price is calculated after a site visit and determination of the scope of work. Whether materials are included is confirmed in the quotation.
  • Condition of the surfaces The more filling, sanding or localised repair required, the greater the scope of work.
  • Floor area of the premises The total area of walls, ceilings and floors affects the amount of work and materials.
  • Finishing materials Paints, floor coverings and other chosen materials affect the overall cost structure.
  • Furniture and access to the premises Occupied or furnished premises may require additional protection and work organisation.
  • Number of finishing details Trims, openings, decorative elements and other small details increase the level of detail involved.

Timeframe

Refreshing a single room

The timeframe is determined by the condition of the surfaces and the scope of finishing.

Cosmetic renovation of an entire flat

The schedule is determined by the number of rooms, the scope of preparation and the materials chosen.

Renovation of an occupied property

The sequence of works is adapted to accessibility and the necessary protection of the premises.

Documentation You Receive

  • Work quotation An agreed overview of work and cost items.
  • Scope of finishing We record which rooms and surfaces are included in the project.
  • Handover procedure Completed works are checked according to the agreed scope.
  • Material agreement If necessary, we record in the project the chosen finishing solutions and materials.
More About the Warranty

Frequently Asked Questions

When is cosmetic renovation enough?

If the layout, electrical wiring, plumbing and other main systems are technically sound, renewing the surfaces and finishes is often enough.

Can you renovate just one room?

Yes, cosmetic renovation can also be planned for a single room or a specific area.

Is it possible to work in a furnished flat?

Depending on the scope of work, this is possible, but access and furniture protection need to be arranged.

Does cosmetic renovation include replacing the electrical wiring?

A full rewiring of the electrical system is not normally part of cosmetic renovation; if it is required, we assess it as a broader scope of renovation.

Is a site visit required before the quotation?

A site visit helps assess the condition of the surfaces and the scope of preparation more accurately, especially when damage is not visible in photographs.

Would you like a quote for your project?

Get a quotation for cosmetic renovation